Wednesday, June 15, 2016

Boosted IP Line is struggling hard and harder and Drenched Supervisory Line is sleeping enough to loss all their rights!!!

Dear Postmasters,

If not now then never.  Lets organise and discuss this on 03.07.2016 Circle level meet at Cuddalore

All Sr.PM posts upto presidency PMs and 50% PSS Group B posts should be granted to supervisors

    IP/ASP association is conveyed their strong objection against the proposed PSS group B/Sr.PM cadre recruitment rules that they are losing their promotional opportunities in PSS group B/Sr.PM post because of the invasion of Postmaster cadre.

     But the fact is on other way. To create the awareness among general line people, facts are collected and published.

     Friends lets fight together to get the equal opportunities at par with IP line. If both IP line and supervisory line is nourished in equal way then only department will grow better and better.

IRRATIONAL  ARGUMENT OF IP/ASP CADRE REGARDING LOSS OF THEIR PROMOTIONAL ASPECTS DUE TO INTRODUCTION OF POST MASTER CADRE

 As on date number of LSG Posts 
6989
 HSG II  Posts    
1703
 HSG I    Posts   
1649
                       Total
10341
Number of ASP Posts 
2036
Number of IP  Posts 
2117
      Total
4153


No of P S S Group B /Sr Post Master Post allotted to 10341 LSG/HSG II / POST MASTER CADRE OFFICIALS.
P S S Group B  3%
26
  Sr Post Masters
29
Total
55



PSS Group B quota to general line is further reduced from 6% to 3%. Thus for 10341 supervisor cadre General line officials have got  55 / Group B/ Sr Post Masters  Posts only i e Just less than 1% only which will  show  the fate of General line officials

No of Group B Posts allotted to IP/ASP cadre through LDCE @ 19%      
165

No of Group Posts allotted to  ASP cadre on seniority  cum fitness’ @ 75%        
649

No of Sr Post master vacancies’ to IP cadre through L D C E @ 75%
  87

Total P S S Group B/ Sr Post Master Post allotted to 4153 IP/ASP cadre                   
901

Thus for  4153 IP/ASP Posts 901 Group-B/Sr Post Master Posts were allotted@22%


HENCE HERE IS THE COMPRISSTION
Total IP ASP cadre Posts      
P S S Group B  Sr Post Master Posts allotted to IP line
No of General line supervisors Posts
P S S Group B Sr Post Master Posts allotted to General line

4153      
901        
 10341
55

Among 4 IPs one IP is getting PSS Group B promotion.

But among 200 supervisors 1 supervisor is getting PSS Group B promotion. What about the fate and future of 198 supervisors????????

2 comments:

  1. Thanks for your information. All Supervisors General Line or PM cadre belonging to other union or not are hereby requested to invariably participate in the Circle level Meet to decide on the injustice caused to us. We have to strongly agitate now itself. I mean never postpone to fight for our rights.

    ReplyDelete
  2. GOOD interpretation. Please arrange to put up this to directorate

    ReplyDelete


Dont forget to post your comments. Your comments and suggestions are valuable to us